Je bent je ingevulde velden bij deze pagina aan het verwijderen. Ben je zeker dat je dit wilt doen?
You are erasing your filled-in fields on this page. Are you sure that is what you want?
Nieuwe Versie BeschikbaarNew Version Available
Er is een update van deze pagina. Als je update naar de meest recente versie, verlies je mogelijk je huidige antwoorden voor deze pagina. Hoe wil je verdergaan ?
There is an updated version of this page. If you update to the most recent version, then your current progress on this page will be erased. Regardless, your record of completion will remain. How would you like to proceed?
Wiskundige Uitdrukking Editor
×
Instructor Settings
Loading settings…
These settings control how Xronos interacts with the LMS shell from which you launched this content. They do not change Canvas availability dates.
This is a detailed numeric model example and walkthrough.
This is intended as a detailed walkthrough to give students an idea of what a
complete and thorough version of a numeric model is. Keep in mind this is the ideal,
and in practice it is often the case that a model can be messier. Moreover, because
this is a numeric model (and the start of the course) this model will be kept relatively
simple in terms of the depth of detail we consider when we are modeling the given
problem.
The Given Problem
You are a master carpenter with several apprentices and you have been
subcontracted by a large construction company on one of their projects; building
apartments in a new apartment building. You need to have a proposal for what to
charge the company to put kitchen cabinetry in a single apartment.
Phase One: Clarify and precisely state the problem.
You know you need to come up with a number to charge to outfit an apartment with
new kitchen cabinets, but more information is needed. How big is the apartment?
How many cabinets are necessary? What type/quality of wood is appropriate? (eg is
it a high end luxury apartment, or a minimal housing apartment for low income
families?) You decide to sit down and brainstorm this initial list of possible things to
consider, so that you can make a list of questions to ask the construction
company in order to get a better idea of what you are expected to design.
(A master carpenter would more easily know which information to
consider and which information is extraneous. You may consider trying to
determine if there is any important information not considered here, or what
information here might be extraneous and why?) You come up with the following
considerations:
(a)
Wood quality (or specific type if available)
(b)
Solid wood construction, or paneled wood construction (ie particle board
or equivalent with veneer facing attached)?
(c)
What cubic footage of storage (or other available dimensions) are needed?
(d)
How many occupants are expected in the apartment?
(e)
Is the cabinetry required to be finished (eg painted and ready for use) or
unfinished (eg only raw wood construction, to be painted and finished by
someone else)?
After further discussion with the construction company you determine you are
expected to supply fully finished solid cherry construction cabinets with brass
hardware, unpainted but sealed with appropriate chemical sealant. Moreover, they
expect 2-3 occupants per apartment and request between 25 and 40 cubic
feet of storage depending on your own professional recommendation for the
space.
Phase Two: Quantifying the Information.
Now that you have a more technical and precise idea of what is expected, you get to
work determining the structure of the cabinets, the amount of materials required, and
the corresponding costs. You know you need to consider the following things that
contribute to cost;
Labor: You expect to need 3 apprentice carpenters for three days, for a
total of seventy two man-hours of work for the apartment.
Travel: Travel to and from the work-site would account for $100 per day
in gas, insurance, and vehicle maintenance.
Raw Materials:
Wood: You can get cherry wood for about $9 a square foot
Hardware: Hinges, screws, finishing nails, and handles come to about
$8 per cabinet.
Finishing Supplies: An oil-based sealant, sanding supplies, and
decorative carving come to about $3 per cabinet (not including
labor).
After looking through the blueprints and determining the build style and structure,
you conclude that your recommended design will have 37 cubic feet of storage and
will need the following for raw materials;
Wood: 30 square feet of wood for the top cabinets and 26 square feet for
the bottom cabinets, for a total of 56 square feet of cherry.
Hardware: There will be a total of 6 top cabinets and 10 bottom cabinets
(for the purposes of hardware, drawers are similarly counted as cabinets),
for a total of 16 ‘cabinets’.
Finishing Supplies: Again there are a total of 16 cabinets.
Finally, as a business owner, you need to include your own salary, a profit margin,
and “slippage” (In subcontracting and contracting work, the term slippage is
often used to describe lost materials or labor due to mistakes in either planning or
execution. For example, someone cutting a board too short by accident may mean
that you lose a certain amount of wood that becomes entirely unusable, even for
other aspects of your project.)
Phase Three: Developing your (numeric) answer
Now that you have written down all the specifics and quantified them, it is time to
determine the final number to send to the construction company. First you compute
the actual raw cost for you (the master carpenter) to build and install the
apartment cabinets, assuming everything goes flawlessly. (Spoiler: it never
does.)
To determine this, we compute the following:
Labor: 3 apprentice carpenters, each paid $25/hr, for 72 man-hours comes to $1000$1800$2800 for labor costs.
Travel: 3 days at $100 a day comes to $33$300$3000 for travel expenses.
Raw Materials:
Wood: 56 square feet of wood at $9 per square foot comes to $504$560$1000 for the wood.
Per-Cabinet Costs: For finishing supplies and hardware it was 16 cabinets
at $11 per cabinet, coming to $80$100$176 total.
Thus your total raw expenses are: \[ (25\cdot 72) + (3\cdot 100) + (56\cdot 9) + (16\cdot 11) = \$1800 + \$300 + \$504 + \$176 = \$2780 \] Thus your raw expenses as the subcontractor
come to a total of $2780 for the apartment. A general rule of thumb for carpentry is
to expect 10%-15% of raw expenses as ‘slippage‘. You decide to play it a bit safe and
round up, adding $430 as a ‘slippage’ factor. You also need to include your own
salary which is billed at $75 per hour, and you figure you had to contribute the
planning and then oversight time for a total of about 40 hours of work, which is $300$1800$3000.
So the official cost for the project is:
\[ (\$2780 + \$430 + \$ 3000) = \$6210 \] for the apartment.
Finally, you always make sure to include some profit margin to guard against
unexpected delays, changes in planning, and various other possible mitigating factors.
So you take the final number of $6210 and add an extra ten percent to be safe. Thus
your final quote for the project (including the extra ten percent) comes to: $6210$6831$7831.
Conclusion
After accounting for all the material costs, mitigating charges (charges against
possible complications in the project that you may be held accountable for),
maintenance and transport fees, and labor, you finally come up with a number for
your contractor of $6831 to build and install cabinets for the apartment.